4 rooms 62 m² the third floor in the building from the bottom: between classes (boxes) and garden!
Very quiet, no noise!
It comprises plus CAVE and GARAGE in the residence. The
m² are very well used, no corridor useless.
Important: The electricity has been restored to 100% throughout the apartment in November 2006! + Plumbing and hot water production renovated in 2005 (electric water heater in lieu of a gas).
Bathrooms:
Bath, basin + mirror + cabinet, closet, all painted white in late 2006, about 4 square meters, tiled floor.
Cuisine:
equipped kitchen, furniture up and down, sink, stove vitro + combi oven / dishwasher, tiled floor. Paint redone in 2006 in White, about 6 sqm.
Stay:
Approximately 20m ², white walls, lino flooring imitation parquet floor, a fitted wardrobe. Ceiling renovated in early 2007 (plafon tense).
Room 2: Approximately 11 m², parquet floor laid in 2006, painting wall and ceiling in 2005. Large closets in place.
Room 3: Approximately 11 m² is the room of our little Camille! Floating floors in 2005, tapestry and painting in 2005.
Very quiet, no noise!
It comprises plus CAVE and GARAGE in the residence. The
m² are very well used, no corridor useless.
Important: The electricity has been restored to 100% throughout the apartment in November 2006! + Plumbing and hot water production renovated in 2005 (electric water heater in lieu of a gas).
Bathrooms:
Bath, basin + mirror + cabinet, closet, all painted white in late 2006, about 4 square meters, tiled floor.
Cuisine:
equipped kitchen, furniture up and down, sink, stove vitro + combi oven / dishwasher, tiled floor. Paint redone in 2006 in White, about 6 sqm.
Stay:
Approximately 20m ², white walls, lino flooring imitation parquet floor, a fitted wardrobe. Ceiling renovated in early 2007 (plafon tense).
Room 1: About 11 m², parquet floor laid in 2006, tapestry to do ...
Room 2: Approximately 11 m², parquet floor laid in 2006, painting wall and ceiling in 2005. Large closets in place.
Room 3: Approximately 11 m² is the room of our little Camille! Floating floors in 2005, tapestry and painting in 2005.
WC.
Entry with closet (tapestry to redo).
Entry with closet (tapestry to redo).
collective underfloor heating, hot water production by 150-liter flask (End 2005).
Cave healthy 6m ², garage in the residence.
The public areas were completely renovated in 2005 by the condominium, no major work planned for 2008.
0 comments:
Post a Comment